D5-2018 - Navigation Aid - Dampier Facilities Channel Stern Lead Light “PEL Light” inoperative
Date published: 17 Apr, 2018 | Port of Dampier
Port users are advised of inoperative 'PEL light'
Download Notice
D4-2018 - Port of Dampier Hydrographic Survey
Date published: 16 Apr, 2018 | Port of Dampier
Port users are advised that a Hydrographic survey is being conducted within the Port of Dampier
Download Notice
Lumsden Point Project - preparatory works
Date published: 12 Apr, 2018 | Port of Port Hedland
Mariners are advised that as part of the Lumsden Point dredging works, a sinker pipeline (566 metres) and a floating pipeline (543 metres) will be installed within the Lumsden Point dredge footprint (see attached chartlet). The pipeline installation works are expected to commence on 13 April and is expected to continue for about two weeks.

The vessel ‘Groote Eylandt’ will be involved in the pipeline installation works. The floating pipeline will be connected to the dredge vessel ‘Eastern Aurora’ which is expected to remain in location until the end of the dredging project. Both vessels will maintain listening watch on VHF Channel 12.
Download Notice
Lumsden Point Project - preparatory works
Date published: 12 Apr, 2018 | Pilbara Ports Authority
Mariners are advised that as part of the Lumsden Point dredging works, a sinker pipeline (566 metres) and a floating pipeline (543 metres) will be installed within the Lumsden Point dredge footprint (see attached chartlet). The pipeline installation works are expected to commence on 13 April and is expected to continue for about two weeks.

The vessel ‘Groote Eylandt’ will be involved in the pipeline installation works. The floating pipeline will be connected to the dredge vessel ‘Eastern Aurora’ which is expected to remain in location until the end of the dredging project. Both vessels will maintain listening watch on VHF Channel 12.
Download Notice
Cancellation of temporary exclusion zone (Port of Port Hedland)
Date published: 28 Mar, 2018 | Port of Port Hedland

Mariners are advised that the Two (2) nautical mile exclusion zone / no go area established around position Latitude-19°59.55’S / Longitude-118°26.55’E, in the vicinity of C2 beacon is cancelled effective from 27 March 0900 Hours LT.

The former notice 05 / 2018 (T) is now cancelled.

Download Notice
Cancellation of temporary exclusion zone (Port of Port Hedland)
Date published: 28 Mar, 2018 | Pilbara Ports Authority

Mariners are advised that the Two (2) nautical mile exclusion zone / no go area established around position Latitude-19°59.55’S / Longitude-118°26.55’E, in the vicinity of C2 beacon is cancelled effective from 27 March 0900 Hours LT.

The former notice 05 / 2018 (T) is now cancelled.

Download Notice
D2-2018 - Woodside Pluto Facilities Depth declaration
Date published: 8 Mar, 2018 | Port of Dampier
Port users are advised of Woodside and Pluto facility depths
Download Notice
Hunt Point Rear Lead - Modification Works
Date published: 21 Feb, 2018 | Port of Port Hedland
Mariners are advised that works for the modification of the Hunt Point Rear Lead will take place between 0600 hours LT (Wednesday) on 21st February 2018 until 1200 hours LT (Saturday) 24th February 2018 inclusive.
Download Notice
Goldsworthy Rear Lead - Replacement
Date published: 19 Feb, 2018 | Port of Port Hedland
Mariners are advised of works to replace the Goldsworthy Rear lead expected to commence between 0700 Hours LT on 20th February 2018 until 1800 Hours 28th February 2018 inclusive.
Download Notice
Goldsworthy Rear Lead - Replacement
Date published: 19 Feb, 2018 | Pilbara Ports Authority
Mariners are advised of works to replace the Goldsworthy Rear lead expected to commence between 0700 Hours LT on 20th February 2018 until 1800 Hours 28th February 2018 inclusive.
Download Notice